<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title><![CDATA[Cervenka Consulting Forums — Smeared Reinforcement]]></title>
		<link>https://forums.cervenka.cz/viewtopic.php?id=1754</link>
		<atom:link href="https://forums.cervenka.cz:80/extern.php?action=feed&amp;tid=1754&amp;type=rss" rel="self" type="application/rss+xml" />
		<description><![CDATA[The most recent posts in Smeared Reinforcement.]]></description>
		<lastBuildDate>Fri, 07 Nov 2014 06:57:09 +0000</lastBuildDate>
		<generator>PunBB</generator>
		<item>
			<title><![CDATA[Re: Smeared Reinforcement]]></title>
			<link>https://forums.cervenka.cz/viewtopic.php?pid=3234#p3234</link>
			<description><![CDATA[<p>Dear samuelhanna93,<br />please do not double-post your questions. </p><p>Moreover, it is not clear from your message if you have already read ATENA Troubleshooting, 2.2.6 How do I calculate the reinforcement ratio when defining smeared reinforcement? The latest version of the document is available from our web under Products - ATENA - Documentation. </p><p>Ad 1.: Always use the cross section area of the macroelement for which you are calculating the smear reinforcement ratio. </p><p>Ad 2.: Use the real reinforcement cross section area.</p>]]></description>
			<author><![CDATA[null@example.com (dpryl)]]></author>
			<pubDate>Fri, 07 Nov 2014 06:57:09 +0000</pubDate>
			<guid>https://forums.cervenka.cz/viewtopic.php?pid=3234#p3234</guid>
		</item>
		<item>
			<title><![CDATA[Smeared Reinforcement]]></title>
			<link>https://forums.cervenka.cz/viewtopic.php?pid=3232#p3232</link>
			<description><![CDATA[<p>Hello,</p><p>I made a model for a Simply Supported Reinforced Concrete Beam Using ATENA (v 5.0.3.0) <br />-beam section is 30 cm x70cm (width x height)<br />-two macro elements was used to model the beam ,the lower part its height = 5cm and include smeared reinforcement and the upper part its height = 65cm </p><p>(1) for the ratio(p=As/Ac) of Smeared Reinforcement,is (Ac) equal 30 cm x 5 cm or 30 cmx70cm ?</p><p>(2)Referred to (ATENA-Engineering-2D_Users_manual) section (4.4.3.4 Smeared Reinforcement)</p><p>[The field ‘Ratio’ should be filled with the value of reinforcing ratio p=As/Ac (where As is the reinforcement cross section area and Ac is the concrete cross section area)].</p><p>Is (As)&nbsp; mean&nbsp; the total area of required reinforcement as known by codes or the reinforcement cross section as written ?</p>]]></description>
			<author><![CDATA[null@example.com (samuelhanna93)]]></author>
			<pubDate>Thu, 06 Nov 2014 23:09:14 +0000</pubDate>
			<guid>https://forums.cervenka.cz/viewtopic.php?pid=3232#p3232</guid>
		</item>
	</channel>
</rss>
