<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom">
	<title type="html"><![CDATA[Cervenka Consulting Forums — Smeared Reinforcement]]></title>
	<link rel="self" href="https://forums.cervenka.cz:80/extern.php?action=feed&amp;tid=1755&amp;type=atom" />
	<updated>2014-11-06T23:10:22Z</updated>
	<generator>PunBB</generator>
	<id>https://forums.cervenka.cz/viewtopic.php?id=1755</id>
		<entry>
			<title type="html"><![CDATA[Smeared Reinforcement]]></title>
			<link rel="alternate" href="https://forums.cervenka.cz/viewtopic.php?pid=3233#p3233" />
			<content type="html"><![CDATA[<p>Hello,</p><p>I made a model for a Simply Supported Reinforced Concrete Beam Using ATENA (v 5.0.3.0) <br />-beam section is 30 cm x70cm (width x height)<br />-two macro elements was used to model the beam ,the lower part its height = 5cm and include smeared reinforcement and the upper part its height = 65cm </p><p>(1) for the ratio(p=As/Ac) of Smeared Reinforcement,is (Ac) equal 30 cm x 5 cm or 30 cmx70cm ?</p><p>(2)Referred to (ATENA-Engineering-2D_Users_manual) section (4.4.3.4 Smeared Reinforcement)</p><p>[The field ‘Ratio’ should be filled with the value of reinforcing ratio p=As/Ac (where As is the reinforcement cross section area and Ac is the concrete cross section area)].</p><p>Is (As)&nbsp; mean&nbsp; the total area of required reinforcement as known by codes or the reinforcement cross section as written ?</p>]]></content>
			<author>
				<name><![CDATA[samuelhanna93]]></name>
				<uri>https://forums.cervenka.cz/profile.php?id=24934</uri>
			</author>
			<updated>2014-11-06T23:10:22Z</updated>
			<id>https://forums.cervenka.cz/viewtopic.php?pid=3233#p3233</id>
		</entry>
</feed>
