Topic: Remote stopping the analysis
Hi,
I'm running ATENA in batch mode and I've set load and displacement monitors. I'd like to know if it is possible to stop processing when the load between two consecutive steps falls by a certain amount (i.e. 50kN).
I know there are conditional break criteria, but they refer to convergence. What I'm trying to do is stop processing remotely when the load monitor shows a 10% fall. This would save me some time and memory.
thanks in advance