Topic: Influence of construction sequence
Hello,
My project is about the ZIP girder system: illustration: http://www.spanbeton.nl/images/file/zip … 6vPL25E5Y0
I like to model that inverted T beam non-linear in ATENA 3D including the deck. For the stresses in the beam the following sequence is of importance:
- 1. The beam is prestressed and only loaded by own weight. (only stiffness of concrete beam)
- 2. The formwork is installed and the concrete of the deck is poured. The cross-section of the girder is bearing the wet concrete of the deck and the loads from 1.
- 3. The traffic load is applied. The concrete deck is hardened. The load is beared by the whole cross-section. (stifness of beam and deck together).
Why this question:
- when I model the whole system the prestressing incorrectly flows into the deck.
- The own weight of the girder is also beared by the deck.
I am modelling non-linear, so I can't superpose the results to each other...
Thanks a lot for the answer.
Kind regards,
Evert